The project, covering an area of 625 square metres, is equipped with a perimeter fence, connections and prepared operational areas. The tank has a capacity to store more than 1,200 cubic metres of water and operational tests have yielded positive results.
The general manager of the Municipal Commission of Potable Water and Sewerage of Altamira, Ing. Marian Denisse Fernández de la Cruz, explained that the project will benefit 15,000 users, who will no longer have low pressure problems on the second floors of their homes.
Mayor Dr. Armando Martínez Manríquez informed that the project represented an investment of 9.1 million pesos contributed by the State Governor, Dr. Américo Villarreal Anaya. The governor was invited to the inauguration of the work.
The project was built on land donated on loan by the Alpek company, as well as by the ejidatarios and the local ejido committee.




