The head of the department, Rogelio Zarazúa Sánchez, announced that the Public Works Directorate executed the works at the sports complex known as the Police and Transit courts. The intervention covered 727 square metres distributed over four levels, located to the side of the sports facility.
The works consisted of replacing floors, walls, and false ceilings, as well as enabling condensing units and maintaining air conditioners. Electrical, hydraulic, and sanitary installations were also improved, paint was applied to interiors and exteriors, glass was replaced, and a general cleaning was performed. Additionally, the first floor was expanded, the roof was waterproofed, and bathroom furniture and 1,100-litre tanks were installed.
With these improvements, the renovated facilities will house administrative services and offer attention in medicine, physiotherapy, psychology, and nutrition. The upgrades will allow members of all categories, from children to veterans, to continue enjoying sports and strengthening the community every weekend.




